Incineration boiler
The customer
- Size: Medium-large company
- Sector: Conversion operator
- Country: United Kingdom
The Project
- Size: 100-120 man-hours
- Duration: 3-4 weeks
The Problem
- Uneven thermal performance on the boiler
- Potential thermal stress issues
- Fatigue analysis required according to industry Standards
Proposed solution
- Model combustion and fluid flow for different operation scenarios and fuels
- Assess thermal expansion for boiler tubes and tubesheets
The simulations
- Steady-state CFD thermal simulation for the waste combustion (CFD analysis)
- Stress calculation for thermally induced loads on mechanical elements (FE analysis)
- Fatigue post-processing for useful life estimation (FE analysis)
Project overall results
- Optimised tubesheets geometry for minimised stresses.
- Savings over £28,000 for the customer in prototyping and testing (estimate).
- Savings of more than 14 weeks in development time (estimate).